TEXAS CHILDREN’S WOODLANDS
Our team provided cranes and riggers over several mobilizations to install chillers and boilers inside the central plant, cooling towers on the plant’s roofs and air handler units on multiple floors of the building. These air handlers had to be taken in the side of the penthouse through an opening with a 3-foot wedge at the bottom. We were also contacted by the elevator company to set the motors on top of the elevator shafts using our A-frame gantries.