ATLANTIC COFFEE

Consolidated Crane used 450-ton crane with luffing jib and skid pans to remove the existing wooden cooling towers and steel structure underneath. After that, we set the new Evapco cooling towers on the roof—a maneuver that required our crane to reach over a structure 190-feet tall.